Bicycle Network Victoria: Metro Routes
East: Hallam Main Drain & Berwick Town Drain
The Hallam Main Drain Trail can be built on or alongside the waterpipe route from the Eummemering Creek/South Gippsland Highway junction in the east, to the Berwick town centre and Monash University (Berwick Campus) in the west
Hallam & Berwick Drain projects
30 June 2010. There are a range of projects that can connect Berwick town centre to the Eummemering Creek and the Metropolitan Trail Network.
The Hallam Main Drain Trail is a priority on the Metropolitan Trail Network.
High priority projects include:
- Building the Hallam Main Drain Trail from the Eummemering Creek Trail junction to the South Gippsland Highway
- Building from the South Gippsland Highway to Centre Road, Berwick
- Building from Centre Road, Berwick, to Grices Road, Berwick
- Build from Centre Road, Berwick north to the Princes Freeway via the Berwick Town Drain
- Connect east side of Princes Freeway to Berwick town centre and Monash University
- Build from Grices Road south to link to Cardinia Creek
- Build further south to connect to the Royal Botanic Gardens in Cranbourne, as possible.