Bicycle Network Victoria

Change the World

Skip to main content or skip to "Also in this section menu".

Search this website

East: Hallam Main Drain & Berwick Town Drain

The Hallam Main Drain Trail can be built on or alongside the waterpipe route from the Eummemering Creek/South Gippsland Highway junction in the east, to the Berwick town centre and Monash University (Berwick Campus) in the west

Hallam & Berwick Drain projects

30 June 2010. There are a range of projects that can connect Berwick town centre to the Eummemering Creek and the Metropolitan Trail Network.

The Hallam Main Drain Trail is a priority on the Metropolitan Trail Network.

High priority projects include: